On October 31, the Turkey Rubber Oil Power Plant passed the government’s acceptance as scheduled, marking a major step forward in the field of rubber oil in the non-traditional market for C.S.I. Group. It is another landmark power plant after the Italian Rubber Oil Power Plant, which will become a shining star of resource reuse of developed countries just like the heavy oil power plant.
It is reported that the genset left from Ningbo Port on July 9. It’s installation was guided by our company’s staff from August 31 to October 31. After two months of installation and commissioning, the acceptance work was very smooth. The main engine of the three 2MW generating sets arranged in this power plant adopts our GN8320 diesel engine, which can use diesel, heavy oil, rubber oil, plastic oil, vegetable oil and many other fuels. The products have the characteristics of advanced design, stable operation, convenient maintenance and low operation cost.
The power plant officially operated with the Turkish State Grid, and the country will purchase electricity and subsidize the project, which will bring huge economic benefits to the owners. After the acceptance, the owner immediately affirmed the operation of the power plant and the company's products, and conveyed his intention to continue the next step of cooperation.